Sorting Floor is in Early Access, and this wiki is a work in progress.

Sorting Floor Player wiki

Government

The government licenses your facility and pays part of its bills. Government satisfaction is the meter that decides whether you keep the license. It starts at 100, and poor Facility Grades drain it. Starting on day 4, satisfaction at 0 at the end of a non-Sunday revokes the license in Campaign and in Sandbox Standard. The Sandbox Training Post preset turns that revocation off. Sundays do not change the meter and do not revoke. The top-bar chip lists the drivers. The license screen lists the causes. See Satisfaction meter, Facility Grade, and Story and Sandbox.

Satisfaction meter

The meter is a chip at the left of the town service scores in the top bar. At 25% or higher it reads "Government" and the percent as one label, such as "Government 82%", rounded to a whole number. Under 25% it reads "Government", the percent, and "LOW" as one label, such as "Government 10% LOW", and the letters turn red. 25% itself is not low.

Hover the chip to see what moves it. The first line is "Government satisfaction:" then the current percent, then "At 0 your operating license is revoked." The next lines are always:

  • "Most changes are applied at day end."
  • "Daily grade: A +8, B +4, C +1, D -4, E -8, F -14."
  • "Missed targets: Sorting -3, Delivery -2, Backlog -3."
  • "Sorted mail left on the floor: -2. Backlog far over the limit: -3."
  • "Late carriers, unpaid wages, failed audits and some events also cost points."

While bulk contracts are on, connected towns grow or shrink on the bulk contract region path, and Service Score does not set that pace. With bulk contracts off in Sandbox, Service Score does set it: a score of 0 is half the usual growth, 50 is the usual amount, and 100 is one and a half times, and the town never shrinks. See Regions and towns and Bulk contracts.

Under 25% one more line appears: "Low: Under 25%. Meet today's targets or the license is revoked." The last line is always "Click to open Operations: Status." Click the chip to open that page. The pointer turns into a hand over the chip.

Warnings

The game warns you twice on the way down. The first notice comes on the day end that takes the meter from 50% or higher to under 50%. It is titled "Government satisfaction is falling" and reads "It is under 50%. The license is revoked at 0%. Open Operations: Status to see what is holding up the mail." A facility in trouble can lose 20 points or more in a day, so treat this one as the real alarm.

The second comes at day end, on a day the meter drops from 25% or higher to under 25%. A notice titled "Government warning" reads "Government satisfaction is critical. Clear bottlenecks and meet SLAs before license pressure ends the round." It appears every time the meter crosses that line, in Campaign and in Sandbox Standard. The Training Post preset does not show it.

The Day Complete summary shows the meter and the whole day-end change, such as "Government: 78% (-6)". That change includes unpaid wage and audit hits, and it matches the top bar. When cash cannot cover wages, a notice titled "Payroll missed" reads "Not enough cash for wages. Unpaid staff:" and the count, then "Government satisfaction, labor relations and employee satisfaction dropped." Keep enough cash for payroll, because one missed payday hurts three meters at once.

Those printed amounts are the standard weights. On the Sandbox Training Post preset, the letter-grade change and the missed-target changes (sorting, delivery, backlog, sorted mail left on the floor, and a backlog more than half over the limit) are each 0.65 times those amounts. The chip still prints the full weights. Late carriers, unpaid wages, failed audits, and events sit outside that scale. The license screen, and what it loads, are on Story and Sandbox.

Service subsidy

The service subsidy is the government's daily payment to your facility. It pays after the facility sorts mail. The grant grows with interior floor tiles above 40, with diminishing returns, so a larger office raises the daily subsidy. The size term is capped.

A Distribution Center applies a 0.6 scale to that subsidy, then adds a distribution stipend ($450.00 plus $50.00 per Loading Dock). The Sandbox Training Post preset multiplies that daily subsidy by 1.25. The distribution stipend is not raised.

The Finance Ledger and the day summary show operating margin before the subsidy, so you can see whether the facility pays for itself. Payroll runway estimates how many wage-days your cash covers. See Finance Ledger.

From day 5, the grant also requires that the facility has accepted inbound mail at least once. Three consecutive non-Sunday days with no inbound mail suspend the grant until mail arrives again. Mail unloaded from a truck counts as accepted inbound mail, the same as a customer drop. The subsidy is settled at every day end, including a day closed by the night skip or by Skip to Monday.

Treasury advance

The Treasury advance is one-time cash to help you get started. Operations: Status offers a Treasury operating advance of $10,000.00 after the first counter sale. You get the cash immediately.

You pay it back at day end. Repayment is a flat $200.00 while the window is the only income (the tutorial, or Sandbox before the facility has processed mail). After that, repayment is at least $200.00 or 15 percent of that day's revenue, whichever is larger, and it cannot exceed the debt still owed.

Service policy

Service policy sets your prices and how busy the lobby gets. Operations: Policy sets Community, Standard, or Premium service policy. The page title is "Policy". The card is "Service policy", and its purpose line is "Sets prices and lobby traffic." The chips sit on that card, not on Intake.

  • Hover Community: "Counter, kiosk and retail prices drop 10%, and the lobby gets 12% busier. Sales raise satisfaction 25% more, and walkouts cost 15% less." The note under the chips reads "Lower prices, busier lobby, friendlier satisfaction recovery."
  • Hover Standard: "Base prices and normal lobby traffic. Satisfaction changes are not scaled." The note reads "Balanced postage and retail. Default for most offices."
  • Hover Premium: "Counter, kiosk and retail prices rise 15%, and the lobby gets 12% quieter. Sales raise satisfaction 25% less, and walkouts cost 20% more." The note reads "Higher prices, quieter lobby, pickier walkouts."

Those percents are the price multipliers 0.90 and 1.15, the lobby multipliers 1.12 and 0.88, sale satisfaction 1.25 and 0.75, and walkout cost 0.85 and 1.20. Hub outbound and street delivery stay on the postage piece rates. They are not scaled by this policy. A "Postage rates" card on the same page lists the counter price for one typical piece. The Finance Ledger shows a weekly operating report every 7th day, on the Facility contracts tab.

Operations: Logistics offers optional equipment service plans for the High-Volume Sorter, the X-ray, and the Auto Postage Machine. You pay a daily fee. Enrolled machines auto-repair at day end instead of running to fail. The kiosk row and the status line call it "Auto Postage kiosk". Weather operations days also raise the electricity bill.

Contracts and phone clearances are separate. See Deals and contracts.

Finance Ledger

The Finance Ledger is your facility's books: what came in today, what went out, what the government pays you and what your contracts are worth. Check it to see whether the facility pays for itself.

Pension

The books carry a Pension line, charged right after payroll. Each day on the roster is one day of service. After 30 days a person keeps a pension for life, whether they retire, quit, or are let go. It is paid from the day they reach retirement age, so letting someone go costs nothing today and a steady amount years later.

The daily pension is fixed on the day they leave. Normal pays a quarter of their last daily wage after 180 days of service, and less for a shorter stay. Heavy pays two fifths after 120 days. A union clerk on $92.00 a day at full service draws $23.00 a day on Normal.

The whole line is capped at a share of the highest daily payroll the facility has ever paid: 10% in the first two years, 15% in the third, and 20% after that. Austerity does not cut it. While that cap applies, a notice titled "Pension limit reached" shows once, not every night. A pension payment is counted once, on the Pension line. It is not also inside "Construction and builds:".

Normal is the default. In Sandbox, Settings: Sandbox has a Staff pension pick: Off, Normal, or Heavy.

Opening the ledger

Click Funds in the top bar, or "Open Finance Ledger" on Operations: Status, to open the Finance Ledger in a separate window. The Funds tip reads "Open Finance Ledger". The title is "Finance Ledger". A second click on Funds closes it. The Status button only opens it. "Close" closes it. Esc closes it, and it does not pause the game.

The Growth Agenda is on Operations: Status, above that button. Its hint reads "Ranked next builds from open contracts, room completeness, DC path, Deals, and bottlenecks." The ledger does not show the Growth Agenda.

The Operations binder

The Operations binder has ten pages, in order: Objectives, Status, Regions, Deals, Staff, Union, Intake, Holidays, Policy, and Logistics. Finances is not one of them. The tab groups are Today (Objectives and Status), Towns (Regions), Money (Deals), People (Staff and Union), and House (Intake, Holidays, Policy, and Logistics).

Each of those pages is a stack of cards:

  • Objectives is titled "Campaign objectives". Its cards are Mission, Goal, Rules, Checklist, Now, Next, and Hint.
  • Status is titled "Facility status". Its cards are Postmaster, Issues, Floor and weather, Ratings, Mail and facility, Growth Agenda, Finance Ledger, Treasury operating advance, Utilities market, and Branding.
  • Intake is titled "Mail Intake". Its cards are Today and Intake level.
  • Holidays has Calendar and Holiday policy.
  • Policy has Breaks, Lobby hours, Service policy, and Postage rates.
  • Union has Labor climate, Contract, Clerks, Carriers, Current grievances, and Event archive. The archive filters are All, Clerks, and Carriers, and it keeps the latest 160 events.
  • Logistics has Stamp stock, Postal fleet, Empty equipment to keep, Equipment service plans, and Dock roles.

The Intake level chips are Reduced, Normal, and Boosted. Reduced is "About 45% less mail each day. It applies from the next day." Normal is "The usual amount of mail each day. It applies from the next day." Boosted is "About 35% more mail each day. It applies from the next day." After a load, the pressed chip is the saved level. When a mission locks a chip, its tip and a note under the chips say why: "This mission only allows Boosted intake." or "This mission does not allow Reduced intake." When manual mail intake control was turned off on New Facility Setup, the note reads "Manual mail intake control was turned off in New Facility Setup." That setting does not lock the chips in Campaign missions.

Breaks are on Staff and traits. Lobby hours are on Counter service. Holiday chips are on Holidays. Dock roles are on Containers and trucks. The stamp order is on Stamps.

The Postmaster card on Operations: Status follows the person on staff. Until a postmaster with a bonus or a drawback is hired, the card adds "Bonus and drawback apply from the day you hire this postmaster, and stop if you fire them." Their bonus and drawback stop the day a retirement leave starts. See Staff and traits.

When something on the floor is stuck, look at the Issues card first. It lists what is holding the facility up. Its hint reads "Click a row to focus the camera." With nothing to report it reads "No issues detected." Some of the rows:

  • "Express mail is waiting for a van (12). Buy a delivery van in Operations: Logistics and put a clerk with a driver's license on the Day shift." The number is the pieces waiting. It shows when the facility has no delivery van, or no clerk with a driver's license on the Day or Split shift.
  • "Place a Scanner Bay so staff can check out scanners.", or "The Scanner Bay has no power, so its scanners cannot charge. Connect it to a powered circuit." It shows when parcels wait at a Package Sorting Station, or when carriers cannot leave with local mail staged.
  • "Carriers are waiting for keys. No cage-qualified clerk is on duty (Accuracy 0.96 or higher)."
  • "Carriers cannot get keys. Paint a Secure Mail Cage zone and place Key Storage." It shows when a Cage Window or Key Storage is placed and the Secure Mail Cage is not complete.
  • "A dock is too crowded. Add a Storage zone so workers have a place for cages and other equipment." Clicking it moves the camera to that dock.
  • "A dock has been crowded too long. Add Storage or paint more Loading Bay inside."
  • "12 local pieces are waiting and no carrier is on duty. Check shift hours and days off." With no carrier hired it reads "12 local pieces are waiting. Hire a carrier to deliver them."
  • "A postal vehicle has no parking stall. Place a Parking Space (Postal Truck) in a Truck Parking zone."
  • An unfinished room uses the zone name and lists what it still needs, such as "Secure Mail Cage is not finished. Needs:" and the missing pieces.
  • "Power brownout. Add a Fusebox or cut HVAC load."

The ledger window

The window header reads "Balance:" and the cash, then "Net so far:" and the amount, then "Operating margin before USO (est.):" and the amount. With no economy figures yet, the line is "No data yet."

The ledger has four tabs: "Today so far", "Rates and support", "Last settled day", and "Facility contracts".

Today so far

This tab shows the current day as it happens. "Income" carries the hint "Wages and electricity settle at day end. Live totals update as you earn and spend." It starts with "Service policy:" and the policy name, then "Gross revenue:" and the amount. "Retail (counter/kiosk):", "Private box rent:", "Contract grants:", "Mail for other towns:", and "Postage, delivery, and other:" appear when those amounts are above zero.

"Mail for other towns:" is what a distribution center was paid for the extra towns it serves (see Regions and towns). "Private box rent:" is the counter setup and the later daily rent. Flyer pay from a bulk contract is inside "Gross revenue:" and "Postage, delivery, and other:" on the day it books, and on Last settled day after midnight. The advance taken back on a failed, finished, or ended bulk contract is inside "Construction and builds:" on that same day. See Private boxes and Bulk contracts. A table titled "Postage sold today" has the columns "Product", "Sold", and "Revenue".

"Expenses" starts with "Spent so far:" and the amount. "Staff insurance:", "Carrier fuel:", and "Treasury repayment:" appear when they are above zero, and so do "Construction and builds:", "Fleet purchases:", "Fines and settlements:", and "Construction and other:".

"Runway and solvency" carries the hint "Accruing (day end)". It shows "Payroll (est.):" and "Electricity (est.):", then the payroll runway. A solvent streak appears once you have one. "Treasury debt:" appears while that advance is still owed.

Rates and support

"Postage rates" lists each product and its rate. The note reads "Service policy sets these rates. Community, Standard, and Premium stay in a reasonable range."

"Government support" shows the lines that apply: "USO subsidy:", "Facility size bonus:", "Distribution Center stipend:", and "Town service stipend:". Support is paid at day end, so during the day the card shows the last settled day, with the note "Paid at day end. Showing the last settled day." With nothing to show, the card is hidden.

The projection is titled "Government support at full satisfaction:". The next lines are "As Station:" and "As Distribution Center:", and the distribution-center line includes the stipend. Compare the two lines before you grow into a distribution center.

Last settled day

This tab shows the last day that has closed. Before the first midnight the tab reads "No settled day yet. Figures appear after the first midnight." After that, "Income" is labeled with the day, such as "Day 6". It uses the settled gross, retail, box rent, contract grants, and postage, plus "Postage sold today" for that day. "Government support" and "Expenses" follow. Settled expenses name "Payroll:" and "Electricity:" rather than the estimates. The result repeats "Last settled day", then "Operating margin before USO:" and "Net:".

Facility contracts

The hint reads "One-time government grants when build milestones are met. Paid once per contract. Requires the Government Contracts deal in Operations: Deals." Until that deal is cleared, the list reads "Locked. Clear "Government Contracts" in Operations: Deals (Postmaster phone work)." Each later row is the contract name, then "PAID" and the grant, "READY", or the unpaid grant amount. See Contracts.

"Weekly operating report" sits on this same tab. Its hint reads "Every 7th day: Operating margin before USO, solvent days, SLA days, and grants. After all facility contracts are claimed, Met-all-SLA weeks pay a small performance grant."